Land & zoning

Setbacks (sempadan)

Отступы (sempadan) · Garis sempadan (setback lines)

In one sentence. Mandatory distances from a river, cliff edge, shoreline, road and temple within which nothing may be built. On canyon-view plots they eat a visible share of the area.

Sempadan is a setback line set by building rules. Bali applies setbacks from the sea (usually 100 m from the high-tide line), from rivers (10–100 m depending on width and embankment), from cliffs and ravines (by slope height), from roads (by class) and from temples, up to "sacred zones" of hundreds of metres around major pura.

Why does it matter in Ubud specifically? The best view plots sit on rivers and canyons. A cliff setback can be 2–3 times the slope height, and on a 1.5-are plot the buildable footprint shrinks to where a two-bedroom villa with a pool no longer fits. It is one of the four reasons a KKPR is refused even in the "right" zone.

Check a topographic survey with levels, the distance to the slope edge and river measured on site, and that the PBG footprint matches the actual setbacks.

Read more in the blog

Related terms

Updated 2026-09-20. Not a public offer. Regulations change, so we cite enacted acts only and update the entry when they do.

We'll match a villa to your brief

Tell us your budget and goal and we'll send a shortlist with prices, floor plans and a yield calculation. No pushy calls.